Extract from §1.80 Section 1:

 

FCC Forfeiture amounts for violations.  *Statutory maximum amounts

revised upwards in June, 2004 and again in 2006..  Most amounts shown below may be revised significantly upward based on egregiousness of the particular

violation, whether harm was done, or if repeated or willful. 

The statutory maximum of $32,500 per occurrence or per day,

$325,000 maximum can be applied to forfeitures shown below.

 

                                                               Violation

                        Forfeitures                             Amount

------------------------------------------------------------------------

Misrepresentation/lack of candor..................    $32,500 to 325,000*

Construction and/or operation without an instrument of       

authorization for the service................................    $10,000

Failure to comply with prescribed lighting and/or marking....     10,000

Violation of public file rules...............................     10,000

Violation of political rules: reasonable access, lowest unit     

charge, equal opportunity, and discrimination................      9,000

Unauthorized substantial transfer of control.................      8,000

Violation of children's television commercialization or          

programming requirements.....................................      8,000

Violations of rules relating to distress and safety              

frequencies..................................................      8,000

False distress communications................................      8,000

EAS equipment not installed or operational...................      8,000

Alien ownership violation....................................      8,000

Failure to permit inspection.................................      7,000

Transmission of indecent/obscene materials...................      7,000

Interference.................................................      7,000

Importation or marketing of unauthorized equipment...........      7,000

Exceeding of authorized antenna height.......................      5,000

Fraud by wire, radio or television...........................      5,000

Unauthorized discontinuance of service.......................      5,000

Use of unauthorized equipment................................      5,000

Exceeding power limits.......................................      4,000

Failure to respond to Commission communications..............      4,000

Violation of sponsorship ID requirements.....................      4,000

Unauthorized emissions.......................................      4,000

Using unauthorized frequency.................................      4,000

Failure to engage in required frequency coordination.........      4,000

Construction or operation at unauthorized location...........      4,000

Violation of requirements pertaining to broadcasting of          

lotteries or contests........................................      4,000

Violation of transmitter control and metering requirements...      3,000

Failure to file required forms or information................      3,000

Failure to make required measurements or conduct required         

monitoring...................................................      2,000

Failure to provide station ID................................      1,000

Unauthorized pro forma transfer of control...................      1,000

Failure to maintain required records.........................      1,000

Failure to maintain directional

pattern within prescribed parameters..........................     7,000

Violation of main studio rule.................................     7,000

Violation of broadcast hoax rule..............................     7,000

AM tower fencing..............................................     7,000

Broadcasting telephone conversations

without authorization.........................................     4,000

Violation of enhanced underwriting

requirements..................................................     2,000

 

 

------------------------------------------------------------------------

 

 

HOME                 BIGBOOK PROJECT                 CONTACT                     ENGINEERING

Call 800-669-3993 for more information